PROJECT FACTS | |
| Client | TTI / Milwaukee |
| Location | Vietnam |
| Floor area | 100,000 m² |
| |
THE PROJECT
DECO CRETE supplied the materials for 100,000 m² of polished concrete at TTI’s Milwaukee project in Vietnam. TTI manufactures power tools and related equipment.
01 — PROJECT REQUIREMENTS
Power-tool manufacturing needs a hard-wearing floor that controls dust and is easy to maintain. TOP SHEELD® hardens and protects the concrete surface, keeping production and goods-handling areas practical to clean.
02 — DECO CRETE SYSTEMS
Mechanical polishing refines the concrete surface. Liquid hardening and final protection support surface durability, dust control and easier cleaning, without covering the slab with a separate floor finish.
| decoSIL | Hardens and densifies the concrete, helping control dusting. |
| decoFINISH | Protects the finished surface and makes cleaning easier. |


